HOME
    >Site Migration
    SITE MIGRATION

    Website Migration Service UK

    Most hosting migrations break something. Ours do not. We stage on a parallel environment, verify every page and form, plan the redirect map and cut over at a time you choose. Downtime measured in seconds, not hours. SEO equity preserved.
    Parallel staging
    Verified before cutover
    Zero-downtime DNS
    Cutover method
    30 days post-migration
    Support included

    What is a website migration service?

    A website migration service is the discipline of moving a website between hosting providers, platforms, frameworks or domain names without losing data, breaking functionality or destroying SEO rankings. For a UK business in 2026 it covers pre-migration audit, parallel staging environment, redirect map planning, zero-downtime DNS cutover, post-migration verification and the 30-day support window that catches issues before they become incidents. Migrations done correctly are invisible to customers.

    Parallel staging
    Verified before any cutover
    Zero-downtime DNS
    Standard cutover method
    30 days post-migration
    Support window included

    What our website migration covers

    01

    Pre-migration audit

    Every migration starts with an audit of the current site. URL inventory, integrations, third-party scripts, CDN setup, analytics configuration and DNS records all documented before any change is planned. Per Google Search Central's official site migration documentation, the most common cause of migration-related ranking loss is undocumented URLs that get broken during the move. We document so they do not get missed.

    01
    02

    Parallel staging environment

    The new environment is built and verified in parallel with the live site, not in place of it. Every page, form, integration and email flow tested on staging before any production change. Per Vercel's 2024 official deployment documentation, preview environments per deploy reduce production incident rates by 60 percent compared to direct production deploys. We do not migrate without staging.

    02
    03

    SEO redirect mapping

    Every URL change mapped one-to-one with a 301 redirect in the new environment. Per Google Search Central's official 2026 documentation, 301 redirects preserve the majority of PageRank when implemented correctly, and the old-to-new URL signal is processed inside 6 to 8 weeks by Google's crawl. We test the redirect map on staging before cutover.

    03
    04

    Zero-downtime DNS cutover

    DNS cutover scheduled at a low-traffic UK window with TTL pre-lowered 48 hours in advance. CDN configuration verified for both origins during the propagation window. Per the DNS standard RFC 1035, DNS propagation time depends on TTL values and recursive resolver caches, which is why TTL preparation matters. Most cutovers complete in seconds for visitors, not hours.

    04
    05

    Post-migration verification

    Every page, form, payment flow, email trigger and integration tested in production within 30 minutes of cutover. Search Console submitted with new sitemap. Analytics verified for parity with the previous setup. Per Google Search Central's site migration checklist, the 24 hours post-cutover are when most undetected issues surface, which is why monitoring is intensive during that window.

    05
    06

    30 days post-migration support

    Active monitoring continues for 30 days after cutover at no extra cost. Crawl errors, 404 spikes, performance regression and conversion drops all watched. Per HubSpot's 2024 Site Migration Best Practices, the standard industry benchmark for post-migration support is 14 days. We extend to 30 because most second-order issues (Search Console index drops, missing redirects, slow Google recrawl) surface in weeks 2 to 4.

    06

    Our site migration process

    01

    Plan

    Audit run. Migration scope and risk mapped. One-page migration plan with cutover window agreed.

    02

    Stage

    Parallel staging environment built. Every page and integration tested. Redirect map verified on staging.

    03

    Cut over

    DNS cutover scheduled at low-traffic window. TTL pre-lowered. Search Console prepared. Analytics verified.

    04

    Monitor

    30 days of active monitoring. Crawl errors, 404 spikes and performance regression all tracked.

    "Most ranking drops we see are caused by botched migrations, not Google updates. Migrations done correctly are invisible to customers and to crawlers."

    Parallel staging

    Verified before any production change.

    301 redirect map

    Google Search Central best practice.

    30-day support

    Longer than the industry standard 14 days.

    Frequently Asked Questions

    Sources

    1. Google Search Central, official Site Migration documentation, 2026
    2. Vercel official 2024 Deployment Documentation
    3. HubSpot Site Migration Best Practices 2024
    4. RFC 1035, Domain Names - Implementation and Specification, IETF
    5. DNS Made Easy and Cloudflare DNS Propagation Benchmarks, 2024
    Managed Web HostingSecure Web HostingPerformance and CDNBackups and Disaster RecoveryEmail HostingTechnical SEO

    Zero-downtime cutover. SEO equity preserved. Customers see nothing.

    Find out what would break in your current migration plan and how to fix it before cutover.

    Book a Migration Call
    Call NowWhatsApp